Utah Projects
META DATA CENTER
Eagle Mountain, UT
Soprema supplied a 700,000 SF SBS Roofing System for Meta at their Eagle Mountain, UT Campus. The SBS roofing system was made of two ply SBS installed by heat-welding the plies together to form a 260 mil thick roofing membrane system.
Summit Blanc
Deer Valley, UT
Soprema begins a Building Envelope project in Deer Valley, UT begining with a Blindside SBS waterproofing system which wil be tied into the positive side self-adhered SBS waterproofing membrane.
Ogden School District
Ogden, UT
Ogden School District: Horrace Mann Elementary School: Soprema SBS 3 Ply Roofing System warranted for 30 Years. The Soprema roofing system consists of a 1/2" Dens deck substrate board, Soprema SopraVap'R vapor barrier, adhered SopraISO and 1/4" Sopraboard in Soprema's Duotack two component adhesive and 3-Ply's SBS membranes set in cold applied adhesive.
MAYFLOWER HOTEL & COVENTION CENTER
Park City, UT
Soprema supplying an entire Building Envelope System comprising of Suprema's SBS roofing and waterproofing combined PMMA, SBS and STPE Waterproofing below grade, STPE technology for air barrier that tie nicely with PMMA traffic and SBS self-adhered roofing vapor barrier.
CAMP WILLIAMS
Camp Williams Army National Guard Base
Building MCRC
Soprema supplied a 20 Year warranted SBS two ply roofing system with PMMA Flashings.
Base ply and top ply have heat-welded seams
Merril Engineering Building
University of Utah
Salt Lake City, UT
Soprema supplied an 80 Mil MIN Thickness Sentinel PVC 30 Year warranted roofing system.
Project was installed over 3 years' time period. Project consisted of a gypsum roof deck retrofitted with a steel roof deck. New Soprema roofing system consisted of Soprema's SopraVap R vapor barrier direct to the new metal roof deck, R-30 SopraISO, 1/2" dens deck coverboard and an 80 Mil MIN Thickness Sentinel PVC membrane.